Long Leaded 900mm Horizontal Cavity Wall Tray 50 x 125mm
Product code: 00006895
0 in stock
- Clear Cavity Widths of Between 50- 125mm
- On External Walls Not Exceeding 102.5mm
- Built from standard brickwork, blockwork
- Manufactured to BSENISO 9001
- Manufactured to BSENISO 14001
Downloads
Product Description
Horizontal Leaded Cavity tray system for all types of brick, block, and stone new build constructions. Low profile taped lapped joints to securely join cavity tray lengths together and create a watertight run.
Product attributes
Brand | Timloc |
---|---|
Colour | Black |
Material | Lead |
Size | 50 x 125mm |
Type | Horizontal Cavity Wall Tray |
Product Reviews
Please log in to leave a Product Review.
please wait
added to basket
View basket